Survey specification review checklist

48 questions to answer before the specification goes to tender. A spec passes review when its owner can answer every one in writing – without asking the contractor.

0 / 48
01

Scope and deliverables

What is actually being bought, stated tightly enough to price and to reject.

02

Geodesy and coordinate reference systems

The single most common root cause in survey failure analysis. None of these are pedantry.

03

Positioning and equipment

Claims are cheap; the spec must make them checkable.

04

Vessel and operations

The platform constrains the survey more often than the sensors do.

05

Personnel and competence

The spec buys people as much as instruments.

06

QA/QC and acceptance

If acceptance criteria cannot be tested, the client has agreed to accept everything.

07

Data and deliverable formats

Deliverables that cannot enter the client's systems were never delivered.

08

Metocean and schedule risk

Weather optimism is a commercial decision disguised as a technical one.

09

Contract and commercial mechanics

Where technical gaps become invoices.